Putting in the door

Sunday October 21, 2012 Started laying down the tile at 8:30am. There is 12"x12" tiles around the perimeter.  Inside of that is a row of 12"x12" gray tiles with a medallion at the four corners.  Home Depot messed up and didn't order them so I left holes for them.  Inside of the gray are 18"x18" tiles.

The 18" tiles go fast, relatively.  It took a lot of mastic which is a pain to mix up.  I finished at 8:30pm.

Tuesday morning I grouted and here it is done.

And here it is with our outside deck furniture in there.  Need to run cable out there now.  After that, I can call the sun room DONE!!!  Something to check off the list.