2/28/2014 Well one side of the bedroom is gooped.  Think I'm going to finish this side then do the other side.  Then I won't have to move the bed too much.  So sanding and gooping again tomorrow.  Then hopefully one last sanding, if I did a good job of gooping.  Sunday is supposed to be 74 out so I probably won't get much done on the bedroom then, vroom vroom.

3/6/2014 Well the room is all primed

3/7/2014 The room is all painted.  I bought all the trim for the bedroom and bathroom.  Have to paint it then put it up, at least the crown molding.  I need to put the floor in before I can do the door molding and baseboards.  The ceiling is Valspar Silver Leaf and the walls are Valspar Metropolis.  The trim is Olympic Dogwood Blossom.

3/11/2014 It was 80 today so I had to work outside.  I got the siding done on the side.  Still have to do the back side with the door.

3/12/2014 Finished the siding on the backside.  Both sides just have primer on them so I still have to paint them.

I started putting up the crown molding the other day.  Now that the outside is done, and the forecast says it's getting cold, 55 for a high tomorrow, its back to working inside.

3/19/2014 The crown molding is all up, the nail holes plugged and I've gone back to touch up everything.  The flooring is supposed to be ready for pickup tomorrow.

Something like this is the plan for the half wall behind the bed.